1
/
of
9
Bedside Table with 2 Drawers and Pine Wood Legs - White
Bedside Table with 2 Drawers and Pine Wood Legs - White
Bedside Table with 2 Drawers and Pine Wood Legs - White
Regular price
£51.95
Sale price
£51.95
Regular price
£79.00
Save 34%
Unit price
/
per
Get it from £4.32 a month with
12 month interest free finance on orders over £500Couldn't load pickup availability
Payment methods
Free 5-7 Day Home Delivery
Hassle-Free Returns
All GST Included
Product description
Product description
Description
Need extra storage in your bedroom or other spaces? Our side table with storage is the great solution. The sleek white frame and natural wood legs add a modern touch to any room. Two drawers provide convenient storage, while pine wood legs offer reliable support. Easily move the nightstand wherever you need it—always at your service.Specifications
- Cut-out handles and natural legs, with a white structure for an elegant look
- Two drawers for storage, keeping night essentials and accessories close to you
- Use as both a nightstand and end table
- Slightly slanted wood legs help keep the table balanced at all times
- Assembly required
- Colour: White
- Material: Particle Board, Pine Wood
- Overall Dimension: 40W x 35D x 50.5H cm
- Drawer Inner Size: 32.5W x 28.5D x 10H cm
- Bottom Height to Floor: 12.5 cm
- Weight Capacity: 28 kg (total), 20 kg (top), 4 kg (drawer)
- Item Label: 831-593V00WT
